The complete transformation of existing grass pitches to a new multi-sports synthetic surfaced all-weather facility. Existing spectator stands and changing rooms were demolished to make way for a new pavilion.
The project entailed the Design & Construction of:
- Full size 3G pitch accredited to FIFA, World Rugby and GAA standards
- 2G synthetic hockey pitch to FIH standards
- Synthetic bowling green to World Bowls Standards
- MUGA pitches for 5-a-side football, tennis and multi-sports use
- New turnstiles in line with IFA standards
- Spectator and ball-stop fencing
- Design and installation of floodlighting system for entire facility using the latest LED technology
- Construction of new access roads and carpark including new LED streetlights